{"id":2972,"date":"2023-10-10T12:29:14","date_gmt":"2023-10-10T12:29:14","guid":{"rendered":"https:\/\/iceag.com\/referenzen\/hhkw-aubrugg-holzkessel-k3\/"},"modified":"2025-02-07T14:48:07","modified_gmt":"2025-02-07T14:48:07","slug":"hhkw-aubrugg-holzkessel-k3","status":"publish","type":"reference","link":"https:\/\/iceag.com\/en\/referenzen\/hhkw-aubrugg-holzkessel-k3\/","title":{"rendered":"HHKW Aubrugg, Holzkessel K3"},"content":{"rendered":"\n<section class=\"eoss_hero_small alignfull\"><div class=\"eoss_hero_small_content\"><h4 class=\"eoss_hero_small_content_subtitle\">Wallisellen ZH, Switzerland<\/h4><h1 class=\"eoss_hero_small_content_title\">HHKW Aubrugg<br>Holzkessel K3<\/h1><div class=\"eoss_hero_small_content_text\"><strong>Client:<\/strong> HHKW Aubrugg AG<br><strong>Location:<\/strong> Wallisellen ZH, Switzerland<br><strong>Capacity:<\/strong> 1x 6.5 t\/h (operation only during heating period), 20 MWth<br><strong>Duration:<\/strong> 2022 &ndash; 2023<br><strong>Project volume:<\/strong> total approx. 40 million CHF<br><br><strong>PDF:<\/strong> <a href=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-HHKW-Aubrugg-CH-2023.pdf\" data-type=\"attachment\" data-id=\"2028\" target=\"_blank\" rel=\"noreferrer noopener\">HHKW Aubrugg, Holzkessel K3.pdf<\/a><\/div><\/div><figure class=\"eoss_background eoss_hero_small_bg\"><img decoding=\"async\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-HHKW-Aubrugg-CH-2023.jpg\"\/><\/figure><\/section>\n\n<div class=\"wp-block-eoss-ananas-blocks-background-white alignfull\"><div>\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-cf05694f wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Plant description<\/h2>\n\n\n\n<p>The aim of this project is to replace the fossil-fuelled district heating boilers from the 1970s with a new K3 wood boiler with a thermal rating of 20 MW. The project started in 2022 based on existing rough studies. The first step was to determine the feasibility. Due to the very tight space conditions in the middle of a motorway junction and the listed building, an in-depth preliminary study in close cooperation with potential suppliers was necessary. Furthermore, the entire planning was performed with the help of a 3D model in order to recognise collisions at an early stage. In terms of process engineering, it was necessary to check how the new plant would be integrated into the existing district heating network during the various heating phases. The in-depth preliminary study, which already has the character of a preliminary project in parts, was completed at the end of 2023. The next step is to assess client funding based on the prepared cost calculation.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"429\" height=\"311\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/Referenzblatt-HHKW-Aubrugg-CH-2023-1.jpg\" alt=\"\" class=\"wp-image-1960\" style=\"width:650px\" srcset=\"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/Referenzblatt-HHKW-Aubrugg-CH-2023-1.jpg 429w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/Referenzblatt-HHKW-Aubrugg-CH-2023-1-300x217.jpg 300w\" sizes=\"auto, (max-width: 429px) 100vw, 429px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-cf05694f wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"426\" height=\"243\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/Referenzblatt-HHKW-Aubrugg-CH-2023-2.jpg\" alt=\"\" class=\"wp-image-1963\" style=\"aspect-ratio:3\/2;object-fit:cover;width:650px\" srcset=\"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/Referenzblatt-HHKW-Aubrugg-CH-2023-2.jpg 426w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/Referenzblatt-HHKW-Aubrugg-CH-2023-2-300x171.jpg 300w\" sizes=\"auto, (max-width: 426px) 100vw, 426px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Technology<\/h2>\n\n\n\n<p><strong>Biomass:<\/strong><br\/>Untreated wood chips<\/p>\n\n\n\n<p><strong>Plant:<\/strong><br\/>Wood firing<br\/>Grate firing<br\/>Boiler<br\/>SNCR<br\/>Skimmer<br\/>Fabric filter<br\/>Back-pressure turbine<br\/>Transfer MD steam<\/p>\n\n\n\n<p><strong>Energy utilisation:<\/strong><br\/>Electricity, district heating<\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-eoss-ananas-blocks-background-grey alignfull\"><div>\n<div style=\"height:75px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Services<\/h2>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">General planning for the<br\/>K3 wood boiler<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Feasibility study<\/li>\n\n\n\n<li>In-depth preliminary study<\/li>\n\n\n\n<li>Enquiries for the main lots with potential suppliers and evaluation of their offers.<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Planning with 3D model<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Entry of the existing plant and the bordering premises<\/li>\n\n\n\n<li>Planning of the entire K3 wood boiler, including assembly.<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Logistics wood delivery<br\/>and transport<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Review of the additional capacities required for wood boiler K3<\/li>\n\n\n\n<li>Planning of the expansion of the transport facilities.<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Renewal of compressed air system<\/h3>\n\n\n\n<p><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-group alignfull has-secondary-background-color has-background is-layout-constrained wp-block-group-is-layout-constrained\" style=\"margin-top:0;margin-bottom:0\">\n<div class=\"wp-block-group is-content-justification-space-between is-nowrap is-layout-flex wp-container-core-group-is-layout-cb46ffcb wp-block-group-is-layout-flex\">\n<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">\n<h4 class=\"wp-block-heading\">We value quality!<\/h4>\n\n\n\n<h2 class=\"wp-block-heading has-background-color has-text-color has-link-color wp-elements-de65a7945160a4b50ed7c78736f25512\">We are audited and fulfil all the requirements<br\/>of the international ISO 9001 and 45001 standards.<\/h2>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"582\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2.jpg\" alt=\"\" class=\"wp-image-1956\" style=\"object-fit:cover;width:284px;height:auto\" srcset=\"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2.jpg 1920w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-300x91.jpg 300w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-1024x310.jpg 1024w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-768x233.jpg 768w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-1536x466.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/div>\n<\/div>\n","protected":false},"author":5,"featured_media":1971,"template":"","reference_type":[],"class_list":["post-2972","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"featured_media_url":"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/Referenzblatt-HHKW-Aubrugg-CH-2023.jpg","acf_values":{"ort":"Wallisellen ZH, Switzerland"},"_links":{"self":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/reference\/2972","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"author":[{"embeddable":true,"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/users\/5"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/media\/1971"}],"wp:attachment":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/media?parent=2972"}],"wp:term":[{"taxonomy":"reference_type","embeddable":true,"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/reference_type?post=2972"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}