{"id":2966,"date":"2024-10-24T11:53:16","date_gmt":"2024-10-24T11:53:16","guid":{"rendered":"https:\/\/iceag.com\/referenzen\/verband-abfall-oberwallis-kva-gamsen\/"},"modified":"2025-02-07T14:49:28","modified_gmt":"2025-02-07T14:49:28","slug":"verband-abfall-oberwallis-kva-gamsen","status":"publish","type":"reference","link":"https:\/\/iceag.com\/en\/referenzen\/verband-abfall-oberwallis-kva-gamsen\/","title":{"rendered":"Verband Abfall Oberwallis, KVA Gamsen"},"content":{"rendered":"\n<section class=\"eoss_hero_small alignfull\"><div class=\"eoss_hero_small_content\"><h4 class=\"eoss_hero_small_content_subtitle\">Gamsen VS, Switzerland<\/h4><h1 class=\"eoss_hero_small_content_title\">Verband Abfall Oberwallis, KVA Gamsen<\/h1><div class=\"eoss_hero_small_content_text\"><strong>Client:<\/strong> Verband Abfall Oberwallis<br><strong>Location:<\/strong> Gamsen VS, Switzerland<br><strong>Capacity:<\/strong> 1x 48&apos;000 t\/a<br><strong>Duration: <\/strong>2008 &ndash; 2023<br><strong>Project volume:<\/strong> total approx. 5 million CHF<br><br><strong>PDF:<\/strong> <a href=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-KVA-Gamsen-CH-2023.pdf\" data-type=\"attachment\" data-id=\"2034\" target=\"_blank\" rel=\"noreferrer noopener\">Verband Abfall Oberwallis, KVA Gamsen.pdf<\/a><\/div><\/div><figure class=\"eoss_background eoss_hero_small_bg\"><img decoding=\"async\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-KVA-Gamsen-CH-2023.jpg\"\/><\/figure><\/section>\n\n<div class=\"wp-block-eoss-ananas-blocks-background-white alignfull\"><div>\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-cf05694f wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Plant description<\/h2>\n\n\n\n<p>The plant was put into operation in 1992. Around 10 years ago, fly ash washing was changed from neutral to acidic. Planning for the new flue gas purification unit began in 2014 with the concept study. The replacement of the entire flue gas purification unit was realised in summer 2016. The tight schedule was a challenge. The system downtime was limited to just under 4 weeks for operational reasons. During this time, the former flue gas purification unit was dismantled and the new one installed and commissioned in the same room. This was followed by various operational optimisations. In 2019, we began strategic planning for the replacement of the furnace and boiler, including the new boiler house. Energy efficiency and the amount of steam to be released are to be significantly increased as part of the new construction (planned after 2025).<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"283\" height=\"234\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-KVA-Gamsen-CH-2023-1.jpg\" alt=\"\" class=\"wp-image-2056\" style=\"aspect-ratio:3\/2;object-fit:cover;width:650px\"\/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-cf05694f wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"410\" height=\"378\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/1-Referenzblatt-KVA-Gamsen-CH-2023.jpg\" alt=\"\" class=\"wp-image-2301\" style=\"width:650px\" srcset=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/1-Referenzblatt-KVA-Gamsen-CH-2023.jpg 410w, https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/1-Referenzblatt-KVA-Gamsen-CH-2023-300x277.jpg 300w\" sizes=\"auto, (max-width: 410px) 100vw, 410px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Technology<\/h2>\n\n\n\n<p><strong>Waste:<\/strong><br\/>Household and commercial waste<\/p>\n\n\n\n<p><strong>Plant:<\/strong><br\/>Grate firing<br\/>4-pass boiler<br\/>Electric filter<br\/>3-stage wet scrubber<br\/>Activated carbon injection<br\/>Catalyst<br\/>Acidic fly ash washing<br\/>Waste water treatment<br\/>Back-pressure turbine and air-cooled condensers<br\/>Process steam discharge<\/p>\n\n\n\n<p><strong>Energy utilisation:<\/strong><br\/>Electricity, process steam<\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-eoss-ananas-blocks-background-grey alignfull\"><div>\n<div style=\"height:75px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Services<\/h2>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">General planner for the<br\/>replacement of the wet flue gas purification<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Condition assessment<\/li>\n\n\n\n<li>Strategic planning<\/li>\n\n\n\n<li>Preliminary study<\/li>\n\n\n\n<li>Project planning<\/li>\n\n\n\n<li>Tendering process<\/li>\n\n\n\n<li>Realisation<\/li>\n\n\n\n<li>Commissioning<\/li>\n\n\n\n<li>Support during the warranty phase<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Feasibility study<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Acidic fly ash washing<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Feasibility study and<br\/>preliminary project<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Replacement of existing plant<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Execution planning<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>E-filter optimisation<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Operational support in<br\/>several areas<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Firing control system<\/li>\n\n\n\n<li>Fly ash washing<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Training<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Operating personnel<\/li>\n\n\n\n<li>Supervisory body for future plant concepts<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-group alignfull has-secondary-background-color has-background is-layout-constrained wp-block-group-is-layout-constrained\" style=\"margin-top:0;margin-bottom:0\">\n<div class=\"wp-block-group is-content-justification-space-between is-nowrap is-layout-flex wp-container-core-group-is-layout-cb46ffcb wp-block-group-is-layout-flex\">\n<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">\n<h4 class=\"wp-block-heading\">We value quality!<\/h4>\n\n\n\n<h2 class=\"wp-block-heading has-background-color has-text-color has-link-color wp-elements-de65a7945160a4b50ed7c78736f25512\">We are audited and fulfil all the requirements<br\/>of the international ISO 9001 and 45001 standards.<\/h2>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"582\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2.jpg\" alt=\"\" class=\"wp-image-1956\" style=\"object-fit:cover;width:284px;height:auto\" srcset=\"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2.jpg 1920w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-300x91.jpg 300w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-1024x310.jpg 1024w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-768x233.jpg 768w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-1536x466.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/div>\n<\/div>\n","protected":false},"author":3,"featured_media":2063,"template":"","reference_type":[],"class_list":["post-2966","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"featured_media_url":"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-KVA-Gamsen-CH-2023.jpg","acf_values":{"ort":"Gamsen VS, Switzerland"},"_links":{"self":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/reference\/2966","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"author":[{"embeddable":true,"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/users\/3"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/media\/2063"}],"wp:attachment":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/media?parent=2966"}],"wp:term":[{"taxonomy":"reference_type","embeddable":true,"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/reference_type?post=2966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}