{"id":2958,"date":"2024-10-24T12:54:54","date_gmt":"2024-10-24T12:54:54","guid":{"rendered":"https:\/\/iceag.com\/referenzen\/m-p-w-tynes-bay-waste-to-energy-facility\/"},"modified":"2025-04-17T08:28:13","modified_gmt":"2025-04-17T08:28:13","slug":"m-p-w-tynes-bay-waste-to-energy-facility","status":"publish","type":"reference","link":"https:\/\/iceag.com\/en\/referenzen\/m-p-w-tynes-bay-waste-to-energy-facility\/","title":{"rendered":"M.P.W., Tynes Bay Waste-to-Energy Facility"},"content":{"rendered":"\n<section class=\"eoss_hero_small alignfull\"><div class=\"eoss_hero_small_content\"><h4 class=\"eoss_hero_small_content_subtitle\">Tynes Bay, Bermuda<\/h4><h1 class=\"eoss_hero_small_content_title\">Tynes Bay Waste-to-Energy Facility, Bermuda<\/h1><div class=\"eoss_hero_small_content_text\"><strong>Client:<\/strong> Ministry of Public Works<br><strong>Location:<\/strong> Tynes Bay, Bermuda<br><strong>Capacity:<\/strong> 2x 48&apos;000 t\/a<br><strong>Duration:<\/strong> 2008 &ndash; 2020 management 1994 -1997<br><strong>Project volume:<\/strong> total approx. 75.5 million USD<br><br><strong>PDF:<\/strong> <a href=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-WtE-Tynes-Bay-Bermuda-2020.pdf\" data-type=\"attachment\" data-id=\"2037\" target=\"_blank\" rel=\"noreferrer noopener\">M.P.W., Tynes Bay Waste-to-Energy Facility<\/a><\/div><\/div><figure class=\"eoss_background eoss_hero_small_bg\"><img decoding=\"async\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-WtE-Tynes-Bay-Bermuda-2020.jpg\"\/><\/figure><\/section>\r\n\n<div class=\"wp-block-eoss-ananas-blocks-background-white alignfull\"><div>\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-cf05694f wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Plant description<\/h2>\n\n\n\n<p>The waste incineration plant on Bermuda started operation with its 2 incineration lines in 1994. Since then, it has been overhauled, modernised and converted numerous times. An expansion by a third line is planned for the future. I.C.E. has been involved in practically all larger-scale work from the start-up of the plant to the present day. Due to the island location, good planning and logistics are a decisive success factor.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"408\" height=\"314\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-WtE-Tynes-Bay-Bermuda-2020-1.jpg\" alt=\"\" class=\"wp-image-2102\" style=\"aspect-ratio:3\/2;object-fit:cover;width:650px\" srcset=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-WtE-Tynes-Bay-Bermuda-2020-1.jpg 408w, https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-WtE-Tynes-Bay-Bermuda-2020-1-300x231.jpg 300w\" sizes=\"auto, (max-width: 408px) 100vw, 408px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-cf05694f wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"407\" height=\"277\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-WtE-Tynes-Bay-Bermuda-2020-2.jpg\" alt=\"\" class=\"wp-image-2105\" style=\"aspect-ratio:3\/2;object-fit:cover;width:650px\" srcset=\"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-WtE-Tynes-Bay-Bermuda-2020-2.jpg 407w, https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-WtE-Tynes-Bay-Bermuda-2020-2-300x204.jpg 300w\" sizes=\"auto, (max-width: 407px) 100vw, 407px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Technology<\/h2>\n\n\n\n<p><strong>Waste:<\/strong> <br\/>Household and commercial waste<\/p>\n\n\n\n<p><strong>Existing plant (2 lines):<\/strong><br\/>Grate firing<br\/>Steam boiler<br\/>Electric filter<br\/>(Reserve space for the further expansion of the flue gas purification)<br\/>2 condensation turbines<br\/>Seawater cooling<\/p>\n\n\n\n<p><strong>Heat utilisation:<\/strong> <br\/>Electricity<\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-eoss-ananas-blocks-background-grey alignfull\"><div>\n<div style=\"height:75px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Services<\/h2>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Strategic planning<\/h3>\n\n\n\n<p>Condition assessment, value conservation, renovation and capacity planning overall plant future strategy<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Preliminary study and project planning<\/h3>\n\n\n\n<p>Plant extension L3 Extension \/ renewal of auxiliary systems renovation \/ replacement L1+2 fly ash transport and processing<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Project planning and<br\/>tendering<\/h3>\n\n\n\n<p>Partial replacement \/ renovation \/ expansion of auxiliary systems new turbine with integration into the overall plant renovation \/ partial replacement of furnace \/ boiler L1+2 replacement of flue gas purification L1+2 Plant extension L3 Fly ash transport and processing<\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Realisation<\/h3>\n\n\n\n<p>New turbine with integration into overall plant renovation \/ partial replacement of furnace \/ boiler L1+2 replacement of flue gas purification L1+2 partial replacement \/ renovation of auxiliary systems<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Management<\/h3>\n\n\n\n<p>Temporary operational management Supervision of commissioning of the entire plant Establishment of operational management on the customer&#8217;s premises Operating concept for new turbine 2 with integration<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\"><\/h3>\n\n\n\n<p><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-group alignfull has-secondary-background-color has-background is-layout-constrained wp-block-group-is-layout-constrained\" style=\"margin-top:0;margin-bottom:0\">\n<div class=\"wp-block-group is-content-justification-space-between is-nowrap is-layout-flex wp-container-core-group-is-layout-cb46ffcb wp-block-group-is-layout-flex\">\n<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">\n<h4 class=\"wp-block-heading\">We value quality!<\/h4>\n\n\n\n<h2 class=\"wp-block-heading has-background-color has-text-color has-link-color wp-elements-de65a7945160a4b50ed7c78736f25512\">We are audited and fulfil all the requirements<br\/>of the international ISO 9001 and 45001 standards.<\/h2>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"582\" src=\"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2.jpg\" alt=\"\" class=\"wp-image-1956\" style=\"object-fit:cover;width:284px;height:auto\" srcset=\"https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2.jpg 1920w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-300x91.jpg 300w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-1024x310.jpg 1024w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-768x233.jpg 768w, https:\/\/iceag.com\/wp-content\/uploads\/2023\/10\/siegel_9001_45001_2-1536x466.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/div>\n<\/div>\n","protected":false},"author":3,"featured_media":2109,"template":"","reference_type":[],"class_list":["post-2958","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"featured_media_url":"https:\/\/iceag.com\/wp-content\/uploads\/2024\/10\/Referenzblatt-WtE-Tynes-Bay-Bermuda-2020.jpg","acf_values":{"ort":"Tynes Bay, Bermuda"},"_links":{"self":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/reference\/2958","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/types\/reference"}],"author":[{"embeddable":true,"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/users\/3"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/media\/2109"}],"wp:attachment":[{"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/media?parent=2958"}],"wp:term":[{"taxonomy":"reference_type","embeddable":true,"href":"https:\/\/iceag.com\/en\/wp-json\/wp\/v2\/reference_type?post=2958"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}