Plant description
The Ulm-Donautal waste-to-energy plant (MHKW) was commissioned in 1997. I.C.E. already took over various execution tasks on the construction site during the construction of the new building. This good cooperation continues to this day.


Technology
Waste:
Household and commercial waste
Existing plant (2 lines):
Grate firing
Steam boiler with SNCR
Electric filter
Gas/gas heat exchanger
3-stage wet scrubber
Additive injection
Fabric filter with steam/gas preheater
Waste water treatment
Evaporation plant
Extraction condensation turbine
Heat utilisation:
Electricity, district heating
Services
Strategic planning
- Condition assessment
- Maintenance, capacity and future planning
Preliminary planning
- Replacement of slag storage and treatment plant
- Performance increase of L1+2 Optimisation of the energy efficiency of the overall plant
- Optimisation of ammonia injection (SNCR)
- Optimisation of air preheating
- Enlargement of waste bunker 3. Process line
Design planning / approval planning / execution planning / preparation and
involvement in the award of contracts /
property monitoring
- Increased performance of the entire plant
- Modernisation of furnace and boiler
- Optimisation of heat transfer RGR L1+2
- Renewal of seepage water storage
- Conversion of grate ash removal
Design planning / execution planning
- Renovation / replacement of induced-draft fans L1+2
- Renovation and increased performance of fabric filter L1+2
Design planning
- Enlargement and renovation of waste bunker
- Partial renovation of EMSR technology
Approval planning
- Various BImSchG (Federal Immission Control Act) change notifications / approval notifications for optimisation of overall plant systems
Property monitoring and documentation
- Evaluation measurements of the above projects
- Documentation review
- Support during the warranty period
- Maintenance planning