Winterthur ZH, Switzerland

Stadtwerk Winterthur, KVA Winterthur ErVeL2

Client: Stadtwerk Winterthur
Location: Winterthur ZH, Switzerland
Capacity: 1x 85’000 t/h (L1), 1x 105'000 t/h (L2)
Duration: 2021 – 2024 (2031)
Project volume: total approx. 300 million CHF

PDF: Stadtwerk Winterthur, KVA Winterthur ErVeL2

Plant description

Incineration line 2 was built in 1993 and is slowly reaching the end of its technical service life. The plan is to generally replace the line one-to-one with a substitute line (ErVeL2). However, the net energy efficiency is to be increased. A condensation stage in the scrubber with heat pump and additional heat recovery from the flue gases upstream of the stack are therefore planned. In order to be able to meet future, lower nitrogen oxide emissions, the SNCR process is being converted to a catalyst. As the scrubbers in Line 1 are the same age, the flue gas purification components will also be replaced here. A new hot water storage tank is planned on the district heating side. The extended preliminary project for ErVeL2 was finalised at the beginning of 2024. A referendum on the loan is planned for autumn 2024. If the decision is favourable, the project wll then be executed.

On September 2024, the Winterthur electorate approved the necessary loan. Construction is scheduled to start in 2026, with commissioning expected to take place in stages until 2031.

Technology

Waste:
Household and commercial waste

Plant (2 lines, newly planned): Grate firing 4-pass boiler Electric filter 3-stage wet scrubber incl. condensation stage Catalyst Lime/Activated carbon injection Fabric filter Back-pressure turbine and air-cooled condenser Hot water tank Waste water treatment

Energy utilisation:
Electricity, district heating

Services

Planning of the entire electromechanical part ErVeL2
Subcontract 1 (SIA 112, Phase
31)

  • Extended preliminary project incl. process engineering calculations
  • Concept development
  • Installation planning
  • Cost estimation
  • Tender for prequalification

Subcontract 2 (SIA 112, phases 32, 33, 41, 51, 52, 53)

  • Commissioned

Renovation concept line 2

  • Assessment of the condition of the existing Line 2 and
    recommendation of necessary renovation work until its replacement in
    2029.