Ludwigshafen, Germany
GML, MHKW Ludwigshafen
Location: Ludwigshafen, Germany
Capacity: Existing plant: 3x 70,000 t/a New replacement lines: 2x 105'000 t/a
Duration: 2000 – 2020
Project volume: total approx. 95 million CHF
PDF: GML, MHKW Ludwigshafen.pdf

Plant description
The Ludwigshafen waste-to-energy plant has been in operation since 1967. I.C.E AG worked for GML for the first time in 2000, when it took part in the conversion and optimisation of the K1 waste-fired boiler. The conceptual design and planning for the IGNIS project began in 2017. It comprises the construction of the new waste-fired boilers K4 and K5, an extension to the boiler house and the slag bunker, the dismantling of the old boilers K1 and K2 and retrofit measures (renovation measures) for the old boiler K3. The project is to be completed by the end of 2024 / beginning of 2025.


Technology
Waste:
Household and commercial waste
Existing plant (3 lines):
Roller grate firing
Steam boiler
Evaporation cooler
Fabric filter
Catalyst
Condensation turbine / Back-pressure turbine
Heat utilisation:
District heating, electricity
Services
Existing plant
- Bid review: Techn. / commercial Award Review of supplier bid for conversion K1
- Engineering service:
Optimisation of firing capacity control K1
IGNIS modernisation project
- General planning IGNIS:
Conceptual design: Retrofit or new building
Preliminary planning
Design planning
Approval planning
Execution planning
Tendering
Award - Technical execution support