Ludwigshafen, Germany

GML, MHKW Ludwigshafen

Client: GML
Location: Ludwigshafen, Germany
Capacity: Existing plant: 3x 70,000 t/a New replacement lines: 2x 105'000 t/a
Duration: 2000 – 2020
Project volume: total approx. 95 million CHF

PDF: GML, MHKW Ludwigshafen.pdf

Plant description

The Ludwigshafen waste-to-energy plant has been in operation since 1967. I.C.E AG worked for GML for the first time in 2000, when it took part in the conversion and optimisation of the K1 waste-fired boiler. The conceptual design and planning for the IGNIS project began in 2017. It comprises the construction of the new waste-fired boilers K4 and K5, an extension to the boiler house and the slag bunker, the dismantling of the old boilers K1 and K2 and retrofit measures (renovation measures) for the old boiler K3. The project is to be completed by the end of 2024 / beginning of 2025.

Technology

Waste:
Household and commercial waste

Existing plant (3 lines):
Roller grate firing
Steam boiler
Evaporation cooler
Fabric filter
Catalyst
Condensation turbine / Back-pressure turbine

Heat utilisation:
District heating, electricity

Services

Existing plant

  • Bid review: Techn. / commercial Award Review of supplier bid for conversion K1
  • Engineering service:
    Optimisation of firing capacity control K1

IGNIS modernisation project

  • General planning IGNIS:
    Conceptual design: Retrofit or new building
    Preliminary planning
    Design planning
    Approval planning
    Execution planning
    Tendering
    Award
  • Technical execution support